Minnesota Department of Transportation Logo
Home | About Mn/DOT | Doing Business | Getting Around |
511 Traveler Information
Mn/DOT A to Z | Contact | Simple Search | Advanced Search |

Highway 55 Project
Plymouth to Rockford

Project Home Overview Project Maps Project Contacts

 

 

Documents

Check back frequently—this page will be updated as information is available.

EIS Need Decision - Negative Declaration, Finding of No Significant Impact, Findings of Fact and Conclusions -January 2009

Environment Assessment/Environmental Assessment Worksheet(EA/EAW) – April 2008

Individual Section Downloads

Click on links below to download individual sections, file size noted in parentheses after each file.

Entire Document Download

Click on the link below to download the entire file as one document, file size noted in parentheses after file.

TH 55 Future Traffic Demand Study – June 2005

 

 

 

 

 

 

 

 

 

 

blank















blank

© 2000-2005 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs | Links | Northstar | Governor's Site |