Minnesota Department of Transportation Logo
Home | About Mn/DOT | Doing Business | Getting Around |
511 Traveler Information
Mn/DOT A to Z | Contact | Simple Search | Advanced Search |

US Highway 10 Wadena Project
Bluffton to Wadena

Project Home
blank blank
Overview
blank blank
Project Maps
blank blank
Local District
blank blank
Project Contacts
blank Contact blank blank Maps
blank

Project Manager
Lori Vanderhider, PE
1000 Highway 10 West
Detroit Lakes, MN 56501
218-846-7955
email »

blank blank

Schematic Alternatives Map

A schematic graphic that illustrates the four alternatives identified in the 2004 Highway 10 Scoping Decision Document: three bypass
alternatives (Alternatives A,B,C) and a through town alternative along existing Highway 10.

Aerial Alternatives Map

This map illustrates the same four alternatives being considered in the project's Draft Environmental Impact Statement (DEIS): three bypass alternatives (Alternatives A,B,C) and a through town alternative along existing Highway 10. However, this map of the alternatives is overlaid onto an aerial photograph that provides additional context about existing local land uses and other conditions.

 

 

 

 

 

 

Go to Top

blank blank blank blank blank
minimap












blank

© 2000-2005 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs | Links | Northstar | Governor's Site |