70 - height in feet of the curved piers along the Mississippi River
-
100 - minimum number of years that the new bridge was designed to last
-
120 - number of precast concrete segments in the main span over the river
-
323 - total number of sensors supporting the "smart bridge" technology
-
504 - length in feet of the main span over the Mississippi River
-
600 - highest number of construction personnel on site
-
750 - miles of steel strand post-tensioning
-
1,800 - number of children that participated in "Casting the Future" educational program
-
50,000 - cubic yards of concrete in the bridge
-
134,000 - pounds of post tensioning bars to hold the segments together
-
141,000 - number of cars that crossed the old bridge daily
-
2,930,000 - pounds of steel post-tensioning strand used
-
11,085,000 - pounds of steel reinforcing bars used in the entire project
|
|
|
 |
 |
 |
 |
|
 |
|